Lichfield and Burntwood drivers are being reminded about roadworks being carried out across the region.

Full list of work:

  • Main Street, Alrewas – temporary two-way traffic signals. Until July 29 (between 9.30am and 3.30pm).
  • Armitage Road, Armitage – temporary two-way traffic signals required to build new traffic island. Until June 26.
  • Boney Hay Road, Burntwood – temporary multi-way traffic signals. Until June 26.
  • Chase Road, Burntwood (junction of New Road and Hospital Road) – temporary four-way traffic signals. Until April 30.
  • Green Lane, Chorley – temporary road closure. Until April 24.
  • Shute Hill, Chorley (from Lower Lane junction to outside Old School House) – temporary road closure. Until May 1.
  • Shute Hill, Chorley (from Old School House to The Lea) – temporary road closure. Until May 15.
  • Chesterfield Road, Lichfield – temporary road closure. Until April 25.
  • Lynn Lane, Shenstone (railway bridge) – temporary two-way traffic signals. Until April 21.

Founder of Lichfield Live and editor of the site.