Lichfield and Burntwood drivers are being reminded about roadworks being carried out across the region.
Full list of work:
- Main Street, Alrewas – temporary two-way traffic signals. Until July 29 (between 9.30am and 3.30pm).
- Boney Hay Road, Burntwood – temporary multi-way traffic lights. Until June 26.
- Grange Road, Burntwood – road closure. Until July 9.
- High Street, Burntwood – temporary two-way traffic signals. Until July 20.
- Morley Road, Burntwood – temporary three-way traffic signals. Until June 28.
- Coleshill Street, Fazeley – temporary two and three-way traffic signals. Until June 25 (8am-6pm).
- Birmingham Road, Lichfield – temporary two-way traffic signals. June 21 (9.30am-3.30pm).
- London Road, Lichfield – temporary road closure. June 30-July 8 (9pm-5.30am).
- Upper St John Street, Lichfield – temporary two-way traffic signals. Sundays until July 3 (8am-5pm).

Thanks for the information actually i am going to Burntwood bia Grange Road on July 7 so chose another way for achieve the destination.