Lichfield and Burntwood drivers are being reminded about roadworks being carried out across the region.

Full list of work:

  • Main Street, Alrewas – temporary two-way traffic signals. Until July 29 (between 9.30am and 3.30pm).
  • Armitage Road, Armitage – temporary two-way traffic signals. Until July 1 (7.30am-6pm).
  • Boney Hay Road, Burntwood – temporary multi-way traffic lights. Until June 26.
  • High Street, Burntwood – temporary two-way traffic signals. Until July 20.
  • Morley Road, Burntwood – temporary three-way traffic signals. Until June 28.
  • Coleshill Street, Fazeley – temporary two and three-way traffic signals. Until June 25 (8am-6pm).
  • London Road, Lichfield – temporary road closure. June 30-July 8 (9pm-5.30am).
  • Rotten Row, Lichfield – temporary two-way traffic signals. Until June 25.
  • Upper St John Street, Lichfield – temporary two-way traffic signals. Sundays until July 3 (8am-5pm).
  • Walsall Road, Muckley Corner – temporary four-way traffic signals. July 2 (9am-5pm).

Founder of Lichfield Live and editor of the site.