> ## Content Index
> Fetch the complete content index at: https://lichfieldlive.co.uk/llms.txt
> Use this file to discover other available public pages before exploring further.

# Lichfield and Burntwood roadworks round-up
- URL: https://lichfieldlive.co.uk/lichfield-and-burntwood-roadworks-round-up-6/
- Published: 2011-06-22T07:30:01.000Z
- Updated: 2011-06-21T19:23:29.000Z
- Author: Lichfield Live
- Tags: Transport, #wp, #wp-post, #Import 2026-07-22 19:32

Lichfield and Burntwood drivers are being reminded about roadworks being carried out across the region.

**Full list of work:**

- Main Street, Alrewas – temporary two-way traffic signals. Until July 29 (between 9.30am and 3.30pm).
- Boney Hay Road, Burntwood – temporary multi-way traffic lights. Until June 26.
- Grange Road, Burntwood – road closure. Until July 9.
- High Street, Burntwood – temporary two-way traffic signals. Until July 20.
- Morley Road, Burntwood – temporary three-way traffic signals. Until June 28.
- Coleshill Street, Fazeley – temporary two and three-way traffic signals. Until June 25 (8am-6pm).
- Birmingham Road, Lichfield – temporary two-way traffic signals. June 21 (9.30am-3.30pm).
- London Road, Lichfield – temporary road closure. June 30-July 8 (9pm-5.30am).
- Upper St John Street, Lichfield – temporary two-way traffic signals. Sundays until July 3 (8am-5pm).