> ## Content Index
> Fetch the complete content index at: https://lichfieldlive.co.uk/llms.txt
> Use this file to discover other available public pages before exploring further.

# Lichfield and Burntwood roadworks round-up (February 21-27)
- URL: https://lichfieldlive.co.uk/lichfield-and-burntwood-roadworks-round-up-february-21-27/
- Published: 2011-02-21T22:38:45.000Z
- Updated: 2011-02-21T22:40:33.000Z
- Author: Staffordshire County Council
- Tags: Transport, #wp, #wp-post, #Import 2026-07-22 19:32

Lichfield and Burntwood drivers are being reminded about roadworks being carried out across the region.

**Full list of work:**

- Old Road, Armitage (near the junction with Ford Way) – temporary stop and go boards required for works to cut back over growing trees. February 23.
- A38 Barton Turn – section of A38 between Barton Under Needwood and Alrewas to be used as part of a diversion route. February 21 to 23 (9.30pm-5.30am)
- Boney Hay Road, Burntwood – temporary multi way lights required for South Staffordshire Water works. Until April 16.
- Rugeley Road, Burntwood (Pooles Way junction) – three way temporary traffic signals to allow for water work. February 21 to 27.
- Lower Lane/Chorley Road (from the junction with Lodge Lane to Maple Brook pumping station) – temporary road closure required for water main renewal works. Until March 6 (9am-4pm)
- Birmingham Road, Lichfield – temporary stop and go boards required for works to relay a water pipe. February 27 (from 9.30am-3.30pm).
- Little Hay Lane, Little Hay (near to the junction of Green Barnes Lane) – temporary stop and go boards required for tree cutting to allow access to overhead power lines. February 25 to March 2 (from 8am-4pm)
- Walsall Road, Muckley Corner (South of Muckley Corner) – temporary road closure required for highway improvements to A5 trunk road. Until March 1 (from 8pm-6am).