> ## Content Index
> Fetch the complete content index at: https://lichfieldlive.co.uk/llms.txt
> Use this file to discover other available public pages before exploring further.

# Lichfield and Burntwood roadworks round-up (March 14-21)
- URL: https://lichfieldlive.co.uk/lichfield-and-burntwood-roadworks-round-up-march-14-21/
- Published: 2011-03-15T14:00:31.000Z
- Updated: 2011-03-15T11:21:18.000Z
- Author: Lichfield Live
- Tags: Transport, #wp, #wp-post, #Import 2026-07-22 19:32

Lichfield and Burntwood drivers are being reminded about roadworks being carried out across the region.

**Full list of work:**

- Boney Hay Road, Burntwood – temporary multi way lights required for South Staffordshire Water works. Until April 16.
- Hospital Road, Burntwood – temporary two-way lights required or new water connection. March 17 & 18.
- Rugeley Road, Burntwood (Pooles Way junction) – three-way temporary lights to allow for water work. Until March 13.
- Park Drive, Chorley – Road closure for water main renewal works. Until April 3.
- Birmingham Road, Shenstone Woodend (Footherley Lane junction) – temporary three-way lights to allow for overhead power line work. Until March 16 (9.30am-3.30pm).
- Watling Street, Wall (A5 to A6127) – temporary two-way traffic lights to allow for surface repairs. Until March 18 (9am-3.30pm).