> ## Content Index
> Fetch the complete content index at: https://lichfieldlive.co.uk/llms.txt
> Use this file to discover other available public pages before exploring further.

# Lichfield and Burntwood roadworks round-up (March 7-14)
- URL: https://lichfieldlive.co.uk/lichfield-and-burntwood-roadworks-round-up-march-7-14/
- Published: 2011-03-07T09:00:31.000Z
- Updated: 2011-03-09T15:32:38.000Z
- Author: Lichfield Live
- Tags: Transport, #wp, #wp-post, #Import 2026-07-22 19:32

Lichfield and Burntwood drivers are being reminded about roadworks being carried out across the region.

**Full list of work:**

- A5013 Croxall Road, Alrewas – temporary two way traffic signals required for tree cutting works. March 8-9 (9.30am-4pm).
- Boney Hay Road, Burntwood – temporary multi way lights required for South Staffordshire Water works. Until April 16.
- Redwood Drive, Burntwood – temporary two way traffic light required for footway resurfacing. Until March 7 (9am-3.30pm).
- Rugeley Road, Burntwood (Pooles Way junction) – three way temporary traffic signals to allow for water work. Until March 2 (9.30am-3.30pm).
- Springhill Road, Burntwood (Oakdene Road junction) – three way temporary traffic signals for gas main work. Until March 11.
- Blackroot Close, Hammerwich – temporary two way traffic signals. March 7 (9.30am-3.30pm).
- Watling Street, Wall (from the A5 to A5127 Birmingham Road) – Temporary two way traffic signals for road surface repairs. Until March 18 (9am-3.30pm)